Transparent Solar Pricing for Andhra Pradesh

No hidden costs, no inflated quotes. Pick your system size, see indicative price, subsidy, monthly EMI, generation and savings — then book a free site survey for the final quote.

See Your Solar Price in Seconds

Pick your size and customer type — we'll show indicative cost, subsidy, generation, savings and payback. Final quote follows a free site survey.

System size
Enter a system size between 1 and 9,999 kilowatts.

Effective system cost
—
—
Gross cost (before subsidy)
—
PM Surya Ghar subsidy
—
EMI estimate
—
—
Annual generation
—
Summer (units/month)
—
Winter (units/month)
—
Monthly savings
—
Annual savings
—
Payback period
—
30-yr estimated bill savings: —

Indicative figures. Final price depends on your roof type, structure, distance from inverter, and net-metering status. The 30-year bill-savings estimate assumes current electricity rates and 0.5% annual generation degradation; maintenance and replacement costs are not deducted. Get an exact quote with a free site survey.

What the Quoted Price Covers

Hardware

BiFacial / TopCon panels (BIS-certified), string inverter, ACDB & DCDB protection boxes, lightning arrester, earthing kit, HDG structure, MC4 connectors, AC/DC cables,etc .

Mounting & Installation

Hot Dip Galvanized structure designed for AP wind & cyclone loads, panel mounting, full DC + AC wiring, inverter commissioning, complete installation and system testing.

Approvals & Net Metering

Discom application (APSPDCL / APEPDCL / APCPDCL), CEIG inspection coordination, net-meter installation follow-up, subsidy filing on the National Portal.

Warranties

30-year panel performance warranty, 10-12 - year product warranty, 5–10 year inverter warranty, 5-year workmanship warranty from Enroute.

Monitoring

Wi-Fi / 4G dongle for live generation monitoring on your phone — no extra cost. Get alerts when output drops below expected.

After-sales

5 Years free parts and service for the solar system. Service Technicians available in every city and town — most callouts answered within 24–48 hours.

Pricing FAQs

Why is the price shown as a range?

Final cost depends on roof type (RCC / metal sheet / Mangalore tile), structure height (standard 1.2 m or elevated 2 m+), distance from roof to inverter, civil work needed, and net-metering inspection complexity. The range covers ~95% of installations — your exact quote falls inside it after we visit your site.

Is GST included?

Yes — all quoted prices include 8.9% blended GST (panels, inverters @5% and rest BOS attract 18%; we wrap it into one figure for clarity as per govt norms).

Do I pay the subsidy upfront?

Subsidy is reimbursed by the central government to your bank account 15–30 days after commissioning and inspection. You pay the gross price; the subsidy comes to you, not us. We file the application on your behalf at no extra cost.

Can the price drop further for larger systems?

Commercial systems above 100 kW are quoted individually — module choice, structure type, and site conditions move the price more than the bracket alone. Send your monthly bill or sanctioned load and we'll send a tailored quote.

What if my generation is lower than estimated?

Our estimates assume south-facing, unshaded panels at 15° tilt. Heavy shade, east/west facing, or polluted environments can reduce output 5–15%. We model this honestly during the site visit and adjust expected savings before you sign.

Ready for an Exact Quote?

Free site survey across Andhra Pradesh. Quote sent within 24 hours.